Quality
Every part carries its heat number, every lot has a test record, and every customer can see both.
Inspection
Every part passes the same checks, whatever the order size.
Every heat is spectro-tested and matched to the mill certificate. Bars are tagged with the heat number.
The first parts from every setup go to the lab for full dimensional inspection before production starts.
Operators gauge critical features every 30 minutes; trends are plotted on SPC charts.
QC inspectors audit every running machine each shift.
AQL sampling to ISO 2859-1 (Level II, AQL 0.65 for critical features), plus 100% sorting where specified.
Labels, counts and packing are checked against the order before sealing.
We send current ISO, RoHS and REACH documents within one working day.